How long does it take for my registration to be activated?

1–2 weeks if a LEG already exists; grid operator deadline of up to 3 months.

It depends on the starting point. If there is already an active community in your area, the lead time up to registration is typically just 1–2 weeks. If a new community has to be set up first, your registration goes on a waiting list until there are enough suitable participants.
​

Setting up a community requires at least one suitable counterpart on the same substation, which means at least one production and one consumption metering point (or a prosumer). The installed generation capacity also has to be at least 5% of the community's connected load – in practice, this is usually the case.
​

Once you have registered, the grid operator has up to three months by law to set up the data transfer and switch the LEG on. UpGrid takes care of building the LEG or vZEV, the legal compliance and the system configuration. No installation work is needed.
​

You can check the current status of your registration at any time at app.upgrid.ch.
​

For municipalities: book a free consultation at upgrid.ch/consultation.