Setting up and joining an energy community
Everything about joining and setting up energy communities
11 articles
- What is a local electricity community (LEG)?The legal framework for local electricity trading in Switzerland since 2026.
- How can I speed up the launch of my energy community?Share your invitation links, bring in producers, get your municipality involved – that is how your community grows faster.
- How do I invite others to UpGrid?Share your personal referral link and earn credit for every referral.
- Can UpGrid handle the billing for an existing or privately organised energy community?Yes – including a LEG that is already set up, private energy communities and existing ZEV or vZEV.
- Is there already a LEG in my municipality?Check on our availability page whether an UpGrid LEG in your municipality is active or still being founded.
- My LEG is being founded. Should I still sign the contract and enter my metering point number?Yes. Without your signature and metering point number we cannot register you, and the LEG will not come about.
- Where can I see the names of the other participants in my LEG?For data protection reasons, we do not show names in a LEG, only the participating locations.
- How do I join a local electricity community (LEG)?Joining a LEG takes four steps: sign-up, matching, technical feasibility, registration with the grid operator.
- What happens after I sign up?Process and timelines after registering with UpGrid.
- Why is the launch of my energy community delayed?Reasons why registration and launch can take longer – and what you can do about it.
- How long does it take for my registration to be activated?1–2 weeks if a LEG already exists; grid operator deadline of up to 3 months.
