“Being founded” means that your LEG has not yet been registered with the grid operator. Usually, participants connected to the same substation are still missing. For the LEG to come about, we need your signature and your metering point number now.
Please sign your contract
Every week, we review new sign-ups and register them with the grid operator. Legally, we can only do this once your signed contract is in place. This also applies if the LEG is still being founded or does not yet have enough participants. Without the signatures of all participants, the LEG will never come about. To find and sign your contract, see the article Where do I find my contract and where do I sign it?
Please enter your metering point number
Depending on the grid operator, we need your metering point number to register you. In your UpGrid account, it is called the smart meter ID. To find the number, see the article Where do I find my metering point number?
What happens next
As soon as enough suitable participants are connected to your substation, we register you within your grid operator's deadlines. You do not need to do anything else.
Get your LEG going faster together
The more neighbours join, the sooner your LEG comes together. You will find your personal referral link at app.upgrid.ch/home/referrals.