How do I join a local electricity community (LEG)?

Joining a LEG takes four steps: sign-up, matching, technical feasibility, registration with the grid operator.

Joining a LEG works through UpGrid in four steps:

1. Sign up: Register at upgrid.ch and tell us where you live and whether you produce electricity, consume it, or both. You do not need the metering point number (smart meter ID) yet – you add it afterwards in your account at app.upgrid.ch.

2. Find a match: We connect you with suitable participants nearby. If an active community already exists in your area, you simply join it – the lead time until registration is then typically only 1–2 weeks. If there is no suitable community yet, your registration is added to a waiting list. Forming a new one requires at least one suitable counterpart at the same substation, that is at least one production and one consumption metering point (or a prosumer). In addition, the installed production capacity must be at least 5% of the community's connection capacity – in practice this is usually the case.

3. Technical feasibility: We clarify the grid topology with the local grid operator before we submit the registration. This also shows how high your discount on grid fees will be: for a LEG covering the whole substation, which is how UpGrid forms communities by default, it is 20%. If all participants are on the same grid level, for example at the same transformer station, it is 40% – such smaller communities are possible for private LEGs or on request. It is a trade-off between the size of the discount and the amount of electricity that can be traded locally; in practice, the larger LEG is often the more economical solution for producers and consumers.

4. Registration with the grid operator: We submit the registration to the grid operator. By law, the operator has up to three months to put the LEG into operation – please allow for this lead time.

You can see the current status of your registration and your community at any time at app.upgrid.ch. No installation is needed, and you do not have to cancel your current electricity provider.